footer_bg

Products

Hello, Welcome To ZINDN!

ZINDN Coatings China Manufacturer Quick-dry Type Cold Galvanizing Compound ZD96-3

The utility model relates to a single component high-solid heavy anticorrosive coating composed of a fusion agent, zinc powder, solvent, etc


Product Detail

Product Tags

Product Description

A one-component high-solids heavy-duty anticorrosive coating composed of fusion agent, zinc powder, solvent, etc.

It can realize the zinc protective layer with galvanizing content above 96% under normal temperature conditions;
Excellent anti-rust properties;
Excellent weather resistance;
Excellent adhesion;
Convenient construction and rapid drying.

Product Features

Color: Zinc gray
Gloss: no light
Volume solid content: 51±3%
Density (kg/L) : 2.7±0.1
Typical film thickness and theoretical coating rate:

最低

典型

最高

干膜厚度(μm)

40

60

80

湿膜厚度(μm)

78.4

117.6

156.8

理论涂布率(kg/m2

0.211

0.316

0.422

Product Construction

Applicable Substrate And Surface Treatment:

New steel: Remove grease from the surface with an appropriate detergent and rinse the surface with fresh water for salt and other dirt. Remove the welding slag, smooth the weld and sharp edges, spray clean to Sa2.5 grade (ISO8501-1), the surface roughness reaches Rz40μm~75μm (medium roughness in the ISO8503-1 comparison plate) is the best, it is best to apply the primer within 4 hours after spray cleaning.Galvanized surface maintenance: use appropriate detergent to thoroughly remove the grease on the surface, wash off salt and other dirt with high-pressure fresh water, use power tools to polish small areas of rust, and recoat with this product.
Construction And Curing Environmental Conditions:

The construction environment temperature is 5~50 °C, the relative humidity of the air is not more than 80%, and the surface temperature of the steel should be greater than the dew point of 3 °C; Bad weather such as rain, fog, snow, strong wind and heavy dust is prohibited for outdoor use;In summer, the temperature is high, be careful with dry spraying, and during construction and drying in narrow spaces, a lot of ventilation is required;

Construction Method:

Airless spraying and air spraying are recommended, brush coating and roll coating are only recommended for pre-coating, small area painting or repair.

Construction Method

 Units

Airless spraying

Air spraying

Brush coating

Gun Aperture

mm

0.43~0.53

1.5~2.5

——

Spray Pressure

kg/cm2

150~200

3~4

——

Dilute Release

%

0~5

510

05

High Drying/Curing Time And Coating Interval:

Substrate surface temperature

5℃

15℃

25℃

35℃

surface dry

1 Hour

45 Minute

15 Minute

10 Minute

harsh drying schedule

3 Hour

2 Hour

1 Hour

45 Minute

Self coating minimum interval

2 Hour

1 Hour

30 Minute

30 Minute

Minimum interval between coats of sealer

36 Hour

24 Hour

18 Hour

12 Hour

Maximum oating interval

Before applying the next coating, the surface should be clean and dry and free of zinc salts and contaminants

Product Use

For steel long-term anticorrosion, can be used in a single layer, can also be coated on the surface of the matching heavy anticorrosion paint to play a synergistic role

To meet various protection requirements. It is a material that replaces or repairs hot spray zinc and hot dip galvanized layer


  • Previous:
  • Next: