A single component high-solid heavy-duty anti-corrosion coating composed of fusion agent, zinc powder, anti-skid material, the anti-slip coefficient ≥0.55
Features
● Metallic coating with more than 90% zinc powder in its dry film, providing both active cathodic and passive protection of ferrous metals.
● Zinc Purity: 99%
● Used by single layer or complex coatings.
● Anti-slip coefficient ≥0.55
Recommended use
It is widely used in railway, highway and bridge, wind power, port machinery and so on. It can replace thermal spraying zinc and inorganic zinc-rich antiskid coating.
Application Instructions
Application methods:
Airless spray /air spray/brush/roller
Brush and roller coating are only recommended for stripe coat, small area coating or touch up.
Substrate and surface treatment
Steel: blast cleaned to Sa2.5 (ISO8501-1) or minimum SSPC SP-6, blasting profile Rz40μm~75μm (ISO8503-1) or power tool cleaned to minimum ISO-St3.0/SSPC SP3
Touch up of galvanized surface
Thoroughly remove grease on the surface by the cleaning agent, clean off salt and other dirt through high-pressure fresh water, use a power tool to polish the area of rust or mill scale, and then apply with ZINDN.
Application & curing conditions
1.Pot life: unlimited
2.Application environment temperature: -5℃- 50℃
3.Relative air humidity: ≤95%
4.Substrate temperature during application and curing should be at least 3℃ above dew point
5.Outdoor application is prohibited in severe weather such as rain, fog, snow, strong wind and heavy dust
6.The temperature is high in summer, be careful with dry spraying, and keep ventilated during application and drying periods in the narrow spaces
Application parameters
Application method |
Unit |
Airless spray |
Air spray |
Brush/Roller |
Nozzle orifice |
mm |
0.43~0.53 |
1.5~2.5 |
—— |
Nozzle pressure: |
kg/cm2 |
150~200 |
3~4 |
—— |
Thinner |
% |
0~5 |
5~10 |
0~5 |
Drying/curing time
Substrate temperature |
5℃ |
15℃ |
25℃ |
35℃ |
|
Surface-dry |
2 hrs. |
1 hr. |
30 mins |
10 mins |
|
Through-dry |
5 hrs. |
4 hrs. |
2 hrs. |
1 hr. |
|
Recoating time |
2 hrs. |
1 hr. |
30 mins |
10 min |
|
Consequent coat |
36 hrs. |
24 hrs. |
18 hrs. |
12 hrs. |
|
Recoating time | Surface should be clean, dry and free of zinc salts and pollutants before recoating. |
Preceding & Consequent coat
Preceding coat:Spray directly on the surface of steel or hot-dip galvanized or hot-sprayed steel with the surface treatment of Sa2.5 or St3.
Consequent coat:ZD Sealer( intermediate coat)、ZD metal sealer(silver topcoat)、ZD Zinc- Aluminum topcoat, ZD Aliphatic Polyurethane , ZD Fluorocarbon, ZD Acrylic polysiloxane ....etc.
Packaging & storage
Packing:25kg
Flash point:>47℃
Storage:Must be stored in accordance with local governmental regulations. The storage environment must be dry, cool, well-ventilated and away from heat and fire sources.
The packaging container must be kept tightly closed.
Shelf life:Unlimited